Список изделий: ... и все, что Вам еще необходимо Siemens

Показано товаров: 10 из 183896
Артикул: 1318691
INDUSTRY SERVICES ENERGETIC MACHINE AND ASSET ANALYSIS ADDITONAL MEASURING POINTS 7-15 IMPROVING THE PLANTS ENERGY PERFORMANCE MEASUREMENT EQUIPMENT MEASUREMENT CONCEPT MEASUREMENT ON SITE EVALUATION AND REPORT INCL. MEASURES NOT INCLUDED SERVICES: TRAVELLING EXPENSES, INSTALLATION OF FURTHER SENSORS LIKE PRESSURE, FLOW OR TEMPERATURE AS WELL AS CONNECTION OF NOT SIMATIC PRODUCTS
Артикул: 1318692
INDUSTRY SERVICES ENERGETIC MACHINE AND ASSET ANALYSIS ADDITONAL MEASURING POINTS 7-21 IMPROVING THE PLANTS ENERGY PERFORMANCE MEASUREMENT EQUIPMENT MEASUREMENT CONCEPT MEASUREMENT ON SITE EVALUATION AND REPORT INCL. MEASURES NOT INCLUDED SERVICES: TRAVELLING EXPENSES, INSTALLATION OF FURTHER SENSORS LIKE PRESSURE, FLOW OR TEMPERATURE AS WELL AS CONNECTION OF NOT SIMATIC PRODUCTS
Артикул: 1318693
INDUSTRY SERVICES ENERGETIC MACHINE AND ASSET ANALYSIS ADDITONAL MEASURING POINTS 7-30 IMPROVING THE PLANTS ENERGY PERFORMANCE MEASUREMENT EQUIPMENT MEASUREMENT CONCEPT MEASUREMENT ON SITE EVALUATION AND REPORT INCL. MEASURES NOT INCLUDED SERVICES: TRAVELLING EXPENSES, INSTALLATION OF FURTHER SENSORS LIKE PRESSURE, FLOW OR TEMPERATURE AS WELL AS CONNECTION OF NOT SIMATIC PRODUCTS
Артикул: 1318694
SIMATIC PCS7 SYSTEM ASSESSMENT SELEKTIVE ANALYSIS OF CURRENT SYSTEM-STAT. REGARDING SERVICEABILITY / IDENTIFIC. OF RISKS/SYSTEM CHECKS BASED ON REPRAESENTATIVE COMPONENTS. SELECTION OF COMPONENTS IN CONSULTATION WITH CUSTOMER RESULT: STATUS REPORT INCL.RECOMMEN- DATION OF MEASURES IN ORDER TO RECOVER SERVICEABILITY AND TO IMPROVE SYSTEM AVAILABILITY OBJECTIVES: - SELECTIVE SYSTEM EVALUATION - 1ST STEP TO SYSTEM AUDIT - PREPARATION OF SHORT-TERM SERVICE CONTRACTS / DETERMIN. OF THE BASIS TO BE SERVICED
Артикул: 1318695
ASSET OPTIMIZATION SERVICES ANALYSIS (MAX 100 ORDER NUMBER) BASED ON DATA PROVIDED BY CUSTOMER AN ANALYSIS AND COMPARISON OF INSTALLED EQUIPMENT AND COMPONENTS IN STOCK IS PERFORMED. IT TAKES INTO ACCOUNT AVAILABILITY AND PRODUCT LIFE CYCLE INFORMATION REGARDING DISCONTINUATION AND DELIVERY TIME FOR EACH PRODUCT. RESULT OF THE ANALYSIS IS A STANDARDIZED PRODUCT- ORIENTED REPORT, WHICH IS VERY IMPORTANT FOR THE OPTIMIZATION OF COMPONENTS IN STOCK AND MAINTENANCE SERVICES.
Артикул: 1318696
ASSET OPTIMIZATION SERVICES CONCEPT (MAX. 3 DAY) BASED ON THE RESULTS OF THE ANALYSIS PHASE A SPECIFIC OPTIMIZATION CONCEPT IS DEVELOPED IN COLLABORATION WITH THE CUSTOMER. A RISK ASSESSMENT OF THE COMPONENTS CAN BE IMPLEMENTED IN CONSULTATION WITH THE CUSTOMER. WITH THIS CONCEPT, OPTIMIZED TARGET STOCK CAN BE DETERMINED. IDENTIFICATION OF COMPONENTS WHICH ARE NOT NECESSARY IN STOCK AND LACK OF SPARE PARTS. RECOMMENDATIONS FOR THE NEXT STEPS ARE GIVEN.
Артикул: 1318697
ASSET OPTIMIZATION SERVICES PRODUCT EXTENSION ADDITIONAL 500 ORDER NUMBER FOR THE ANALYSIS THE ANALYSIS OF LARGE STOCKS AND INSTALLED COMPONENTS INCLUDING MORE THAN 100 DIFFERENT ORDER NUMBERS CAN BE ORDERED OPTIONALLY IN PACKETS OF 500 PIECES.
Артикул: 1318698
ASSET OPTIMIZATION SERVICES TIME EXTENSION ADDITIONAL 1 DAY FOR ANALYSIS & CONCEPT THIS OPTION CAN BE ORDERED ADDITIONALLY ON A DAILY BASIS E.G.: FOR DEVELOPMENT OF LARGE CONCEPTS (> 3 DAYS) AND ON-SITE PRESENTATION OF THE RESULTS OF THE ANALYSIS.
Артикул: 1318699
DAMAGE REPORT CONVERTER LD-SERVICE TRACTION 2.1 GERMAN
Артикул: 1318700
DAMAGE REPORT CONVERTER LD-SERVICE TRACTION 2.2 ENGLISH