Inspection options Siemens
Опции
F71 to F73 and F80 to F85
Inspections for converters
Endurance run test bays up to 270 kW in Siemens Ruhstorf factory
In general, every converter that leaves the factory is subjected to a routine test under load conditions. The converter is therefore preparameterized. This assures the high quality standards of every SINAMICS G180 converter. Options F71 to F73 and F80 to F85 also allow further tests to be performed, also with the customer present.
Options for inspections mutually exclude each other.
Inspections for converters | Option | ||||||||
---|---|---|---|---|---|---|---|---|---|
Routine test under no-load conditions with the customer present | F71 |
|
|
|
|
|
|
|
|
Routine test with 1PS or 1MD motor (ordered with converter in package), under no-load conditions (without customer present) |
| F72 |
|
|
|
|
|
|
|
Routine test with 1PS or 1MD motor (ordered with converter in package), under no-load conditions with customer present |
|
| F73 |
|
|
|
|
|
|
Visual inspection and function test under rated load using test bay motor (without customer present) |
|
|
| F80 |
|
|
|
|
|
Visual inspection and function test under rated load using test bay motor with customer present |
|
|
|
| F81 |
|
|
|
|
Visual inspection and function test under rated load with 1PS or 1MD motor (ordered with converter in package) (without customer present) |
|
|
|
|
| F82 |
|
|
|
Visual inspection and function test under rated load with 1PS or 1MD motor (ordered with converter in package) with customer present |
|
|
|
|
|
| F83 |
|
|
Advanced visual inspection and function test under rated load with 1PS or 1MD motor (ordered with converter in package) (without customer present) |
|
|
|
|
|
|
| F84 |
|
Advanced visual inspection and function test under rated load with 1PS or 1MD motor (ordered with converter in package) with customer present |
|
|
|
|
|
|
|
| F85 |
Option description |
|
|
|
|
|
|
|
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Measurement of shaft voltage, vibration and audible noises at no load on the motor |
| ✓ | ✓ |
|
|
|
| ✓ | ✓ |
Measurement of the output of the converter (efficiency, power factor) |
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Measurement of the output at the motor (efficiency, power factor) |
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Harmonic analysis of line and motor current at the test bay motor |
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Warm-up at the drive''s rated operating point |
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Temperature measurement on the converter |
|
|
| ✓ | ✓ | ✓ | ✓ | ✓ | ✓ |
Temperature measurement on the motor |
|
|
|
|
| ✓ | ✓ | ✓ | ✓ |
Temperature measurement on LOHER 1PS or 1MD motor |
|
|
|
|
|
|
| ✓ | ✓ |
Special tests under full-load conditions:
|
|
|
|
|
|
|
| ✓ | ✓ |
Special tests in no-load operation:
|
|
|
|
|
|
|
| ✓ | ✓ |
Submission of the inspection report | ✓ |
| ✓ |
| ✓ |
| ✓ |
| ✓ |
With customer present | ✓ |
| ✓ |
| ✓ |
| ✓ |
| ✓ |
Note:
If the layout of the test bay permits, for an additional charge the test can be performed using a transformer or with the original motor of another manufacturer which has been provided by the customer.
The scope of the test following inspection F72 or F73 corresponds to the routine test for oil & gas projects according to DEP (Design and Engineering Practice) 33.66.05.33‑GEN, Feb. 2012, Section 15.2.
The scope of the test following inspection F84 or F85 corresponds to the performance test for oil & gas projects according to DEP (Design and Engineering Practice) 33.66.05.33‑GEN, Feb. 2012, Section 15.1.
We can offer further tests on request that are not included in the respective inspections at an additional charge. It is important to note that if the scope of the tests change, the prices for the individual inspections can change significantly, which is why we request prior consultation with the factory.